Because we're coming from Athens, we build the drive into how we schedule panel jobs in Triana rather than treating it as an afterthought. A single-panel swap on a standard steel door, once the part is on the truck, usually runs under two hours once we're on site. What stretches a job is the panel itself - with Triana's housing mostly built in the last two decades, a fair number of doors use panel profiles that aren't sitting on a shelf anywhere nearby, so we confirm the exact panel before we load the truck rather than guess and make two trips. With 1,359 households in the area, we're not running a daily route through Triana the way we might through denser parts of the service area, so we batch the trip: measure and photograph the existing panel on the first visit, then come back with the matched part. That two-visit rhythm is standard for Triana jobs, not a sign anything's gone wrong.